Key City HAUL-AWAY

Mankato · North Mankato · Blue Earth County

Deck removal in Mankato

A deck comes apart in the reverse of how it went up: railings, boards, joists, beams, posts. The typical Mankato-area range is $400 to $900, set mostly by square footage and height off the ground.

Deck lumber is construction and demolition waste. The county landfill prices that by the cubic yard, not by the pound, and the dedicated demolition landfill on 231st Lane takes it as well.

What a removal includes

  • Decking, joists, beams and posts
  • Railings, balusters, stairs and landings
  • Skirting and lattice
  • The ledger board, removed from the house wall
  • Hardware and nails picked up from the ground underneath

What it does not include

Patching the siding where the ledger was attached, and building anything new. Concrete footings are usually cut off at or below grade or left for the next deck. Digging them out entirely is extra work: see construction debris removal.

Treated lumber

Most deck framing is pressure-treated. It cannot be chipped or composted with yard waste. It goes with the demolition load. The same applies to the treated posts of a swing set: see playset removal.

Often done together

If a hot tub sits on or in the deck, it has to come out first: see hot tub removal. If a shed is going at the same time, see shed removal. One visit for two teardowns usually costs less than two visits.

What deck removal costs in Mankato

Typical Mankato-area range

JobTypical rangeNotes
Small deck or landing $400–$550 Up to about 120 sq ft, low to the ground
Mid-size deck $525–$725 About 120–250 sq ft
Large or second-story deck $700–$900 More framing, more stairs, more care
Footings dug out Quoted separately Per footing

Typical Mankato-area range, not a quote and not an offer. No hauler’s price list sits behind these figures. The independent hauler who takes your request sets the actual price, normally after seeing the items, and you are free to say no to it.

Questions about deck removal

Can the good boards be saved?

If you want to keep some lumber, say so before the work starts and it can be stacked for you. It slows the job a little.

Is composite decking handled differently?

It is heavier and it is still demolition material. Mention it, because it affects the load.

How long does it take?

A mid-size deck is typically most of a day for two people, including loading.

(507) 519-4948 Get a price